I have about 250 to 300 procedures in my current project. Unfortunately, it's an port and I'm changing a lot of procedure names. It can be maddening to sift through all of them to find the one I want in the watch list procedure drop down.
There's an alpha sort option for the procedure window, it'd be great if there was one for the watch list procedure drop-down.
Thanks.
Jon
